ddna talk - detail map 7 - don cubero

detail map 7 - Don Cubero




Description:
There are two unique aspects of Marquez in this slide. The first is the width of Marquez from Don Diego and Don Cubero to Galisteo. The right of way is approximately 60', which will allow for separate sidewalks and bike path as well as the winding trajectory feature. All these feature are important to develop since Marquez's existing expanse encourages drivers to speed even more than they do west of Don Diego. The second aspect is the large dirt lot between the Credit Union on its west and apartments on its east. The lot has become an impromptu parking lot for the Alfalfas grocery store on its southern edge. The lot owner has agreed to develop the lot as a park which will also incorporate parking for park users and Alfalfa shoppers.
Proposal:
This section's trajectory of Camino de los Marquez will include a curb cut on its south side, near the credit union, to provide access for park visitors and shoppers. Parallel parking is allowed on the northwest part of this section of the street. East of the intersection with Don Cubero, there are predominantly condominiums and apartments, all with their own ample off-street parking; therefore, from this section east there will be no more on-street parking. Across Marquez, the corners at Don Cubero will be extended in a manner similar to other street corners in this project, with the entry to Don Cubero narrowed to 19'. The park paths shown going north are aligned with the sidewalks of Don Cubero for safe pedestrian access to the park. These crossings, are marked. Since the park area sees a lot of pedestrian traffic from the neighborhood to the north and northeast, The intersection with Don Cubero is another one selected to be raised, with a change in pavement.

[Back [Up] [Next]
Previous slide Up to slide index Next slide
Last update: 1 July 97 - Hubert van Hecke